FAQs

If you’re trying to decide if the PowerMuster Package is the best option for you, please look through our commonly asked questions below. If your query is still left unanswered please contact Cameron Rogers on 0492 159 125, or by email on cameron.rogers@solarsuite.com.au

Alternatively, Click Here to send us an enquiry

Commonly Asked Questions

Can the PowerMuster operate as an off-grid system?

Yes, the PowerMuster is perfect for off-grid operation, with enough Solar panels to generate in a single day, a week’s worth of electricity
The battery can run the average farmhouse for at least 24  hours, even if the sun doesn’t shine.

Can the PowerMuster be connected to the Grid?

Yes, the PowerMuster’s inverter is a ‘Hybrid’, meaning that it can work off-grid or be connected to the Grid, or a generator if you choose.

The PowerMuster's inverter is 3-phase, but my Grid connection is dual-phase. Will it work?

Yes, the Hybrid inverter is very flexible and can supply to a single or dual-phase switchboard.

Is the PowerMuster Pack approved by Western Power?

Yes, all the PowerMuster Pack’s components are on the Clean Energy Council’s ‘Approved Products’ list and approved for connection to the Western Power network.

What if I need more power?

The PowerMuster Packs are scalable to meet the needs of most businesses and farmers.

Do you assist with design and give installation feedback?

Yes, our electrical engineers and design team can propose system layout for each system purchased.

For full terms and conditions please read through our PowerMuster Pack terms and conditions below.

PMP Terms & Conditions